UTILITY INSTALLATION

CAVOUR LIFT STATION AND FORCEMAIN IMPROVEMENTS

Installation of new lift station, valve vault, sewer forcemain and highway bores.

Contract Amount:   $379,207.00

Completed:             7/29/2017

Engineer:                 Banner Associates, Brookings, SD

LAKE POINSETT EAST AND NORTHEAST LAKE DRIVE WASTEWATER SYSTEM EXPANSION

New lagoon construction, three lift stations, 60 grinder pumps, gravity sewer, sewer forcemain, and hookups to 122 homes.

Contract Amount:   $2,281,924.00

Completed:             11/5/2018

Engineer:                 Banner Associates, Brookings, SD

CONDE WATER SYSTEM IMPROVEMENTS

New well house, pumps, water tank, and installation of new 6" watermain pipe, valves, fittings and other appurtenances.

Contract Amount:   $1,977,062.67

Completed:             6/26/2019

Engineer:                 Helms & Associates, Aberdeen, SD

SDDOT MADISON HWY 34 URBAN RECONSTRUCTION

Remove and replace watermain, sanitary and storm sewer.  Watermain pipe sizes ranged from 4" to 10"; sanitary sewer pipe sizes ranged from 6" to 18"; and storm sewer pipe sizes ranged from 18" to 54".

Contract Amount:   $2,110,036.06

Completed:             6/1/2020

Engineer:                 SDDOT

Prime Contractor:   D&G Concrete Construction, Inc.

CLARK RURAL WATER SYSTEM - WILLOW LAKE AND BRADLEY IMPROVEMENTS

Approximately 11.5 miles of 6" water main, 6 miles of 8" water main and approximately 1 mile of 10" water main installed.

Contract Amount:   $1,550,057.55

Completed:              7/29/2021

Engineer:                  Banner Associates, Brookings, SD

SDDOT STORM SEWER AND WATERMAIN LOWERING

Installation of 5 custom concrete structures, 1,859' of double 42" arch concrete pipe, 632' of 30" concrete pipe, concrete flatwork, and asphalt paving.

Contract Amount:   $1,468,852.70

Completed:             12/4/2021

Engineer:                 SDDOT

AURORA SANITARY SEWER LIFT STATION IMPROVEMENTS - 2022

Installation of a new wet well, valve vault, and generator building, and retrofitting the existing wet well and valve vault  into a transfer structure and bypass vault.

Contract Amount:   $2,014,598.80

Completed:             10/27/2023

Engineer:                 Banner Associates, Brookings, SD

MADISON WATER SYSTEM IMPROVEMENTS PHASE 2

Approximately 20 city blocks of removal and installation of sewer main, water main, services, asphalt paving, and concrete curb and gutter.

Contract Amount:   $6,004,613.38

Completed:             7/9/2024

Engineer:                 Banner Associates, Brookings, SD

LAKE PRESTON WATER AND WASTEWATER IMPROVEMENTS PHASE 1

Approximately 29 city blocks of removal and installation of sewer main, water main, services, asphalt paving, and concrete curb and gutter.

Contract Amount:   $7,184,875.23

Completed:             9/9/2024

Engineer:                 Banner Associates, Brookings, SD

FLORENCE WATER SYSTEM IMPROVEMENTS

New well house and pumps, a new water tank, all new distribution water main and services, and rebuilding the streets after the pipe was installed.

Contract Amount:   $1,920,890.85

Completed:             11/27/2017

Engineer:                 Helms & Associates, Aberdeen, SD

AGROPUR SEWER OUTFALL LINE

Installation of 14 miles of 16" pipe, along with 35 air release valves, and other appurtenances.

Contract Amount:   $3,279,820.14

Completed:             12/7/2018

Engineer:                 Banner Associates, Brookings, SD

KINGBOOK RURAL WATER SYSTEM EXPANSION

Installation of 178 miles of rural water pipe ranging in sizes from 1 1/2" to 16", along with 240 services.

Contract Amount:   $9,541,833.71

Completed:             10/18/2019

Engineer:                 DGR Engineering, Rock Rapids, IA

LAKE NORDEN WELLFIELD AND RAW WATER TRANSMISSION

Installation of 5,247' of 10" watermain, and directionally drilled 3,300' of 12" watermain, as well as 3 new well heads.

Contract Amount:   $1,599,147.15

Completed:             8/25/2020

Engineer:                 Banner Associates, Brookings, SD

ELKTON UTILITY IMPROVEMENTS - PHASE 1

Approximately 25 city blocks of removal and installation of sewer main, water main, services, asphalt paving, and concrete curb and gutter.

Contract Amount:   $4,616,081.65

Completed:             11/3/2021

Engineer:                 SPN & Associates, Mitchell, SD

KINGBROOK RURAL WATER SYSTEM BRYANT PUMP STATION

Installation of a new pump station building with misc. site and process piping, new 127,000 gallon storage tank, and new meter pit structure.

Contract Amount:   $1,432,857.00

Completed:             10/3/2023

Engineer:                 DGR Engineering, Rock Rapids, IA

ARLINGTON OUTFALL LINE REPLACEMENT

Installation of new 15" sanitary outfall line with concrete manholes and other appurtenances.

Contract Amount:   $854,183.44

Completed:             6/25/2024

Engineer:                 Banner Associates, Brookings, SD

LEWIS & CLARK REGIONAL WATER SYSTEM MADISON SERVICE LINE SEGMENT 2/3A

Installation of 16 miles of 16" watermain, fittings and other appurtenances.

Contract Amount:   $15,582,766.52

Completed:             7/9/2024

Engineer:                 Banner Associates, Brookings, SD

LAKE POINSETT ESTATES SANITARY SEWER REPLACEMENT

Installation of new 8" sanitary sewer gravity main and 3" forcemain, along with 4" sewer services.

Contract Amount:   $835,985.75

Completed:             10/25/2024

Engineer:                 Banner Associates, Brookings, SD